ABOUT SHIBANG MACHINERY
Shanghai Shibang Machinery Co., Ltd. is professional manufacturer of grinding mil and powder making equipment.It is a major production and export base of sand-stone and powder making machinery in China......
china trust
We have got the certificate of CHINA TRUST! The Certification of Enterprise’s Identity is a process that the professional certification organization to verify the legality and truthfulness of enerprise and double check whether the applicant is authorized. The certificati-on service of China Suppliers is prov-ded by China Internet Network Information Center and Beijing International Business Credit Evaluation Company.
How to ensure the safe operation of the raymond mill (raymond mills) ?
raymond mills knowledge for you
Make the safe operation of raymond mills :
  When starting milling, you should check whether all the raymond mills maintenance doors closed tight, check the crusher jaw plate gap is in line with the feed grain size, adjust the analytical engine speed should reach approximate finished size requirements. And press to start the order.
The Steps of starting the raymond mills :
 >1. starting basket bucket elevator;
 >2. activate the jaw crusher;
 >3. when there are material silo, start analysis machines;
 >4. to start the air blower (air load to start until the normal operation after the load);
 >5. start the host, start the host instant starts electromagnetic vibrating feeder. Grinding work shall be started at this time. Simple sequence of operations are as follows: Start: enhancing machine crusher → → Fan → → analyzer mainframe → Feeder.
Shutdown should be in the following order the closure of the machine:
 >1. first close the feeder to feed material;
 >2. about one minute after the cessation of host;
 >3. blowing the net residual powder after the cessation of sub-blowers;
 >4. the final closing analyzer. Shutdown sequence is: Feeder → → Blower → Analysis of the host machine.
 Note: hoist transport materials to a certain amount of silo, the first stop after the cessation of broken machines, upgrade, this should change in the existing storage Charging Capacity.
 >5. milling machines during normal working hours are not allowed to refuel at random, to ensure safety in production and milling machine in any part of the unusual noise, or a sudden increase in load should immediately stop inspection, troubleshooting, so as to avoid a major accident. Then continued to boot mill must be removed within a more than expected, or when the current boot is too large, the impact starts.